Show simple item record

dc.contributor.authorCarpio de los Pinos, Antonio José
dc.contributor.authorGonzález García, María de las Nieves
dc.contributor.authorMartínez Pérez, Inmaculada
dc.contributor.authorPrieto Barrio, María Isabel
dc.date.accessioned2021-09-30T08:26:48Z
dc.date.available2021-09-30T08:26:48Z
dc.date.issued2020-11
dc.identifier.citationCarpio, A. J., González, M. de las N., Martínez, I., & Prieto, M. I. (2020). Protocol development: level of preventive action method, considering the preventive environments in construction works. Journal of Civil Engineering and Management, 26(8), 819-835. https://doi.org/10.3846/jcem.2020.13598es
dc.identifier.issn13923730
dc.identifier.urihttp://hdl.handle.net/20.500.12251/1976
dc.description.abstractThe techniques for preventing risk have traditionally been analyzed on an individual basis, it being highly complex to apply preventive procedures across the board in construction works. This implies the necessary risk assessment based on the common factors of Safety at Work, Industrial Hygiene, Ergonomics and Psychosociology. This work analyzes and classifies the environments which characterize the building process: absolute (initial), documentary, construction, social and life cycle, and identifies the technical-documentary processes associated with each one. Finally, a new risk assessment method adapted to building works is proposed, called “Level of Preventive Action”, by means of a new mathematical formula which encompasses Safety at Work, Industrial Hygiene, Ergonomic and Psychosociological factors. It is based upon the development of the William T. Fine method, adapting it to construction works, with the incorporation of six parameters to explain the degree of correction. It consolidates and connects environment parameters to determine the preventive action level of the construction work, with the objective of establishing the levels of preventive control required to achieve an optimum prevention situation. The results of comparison between the environments in the implementation of the new risk assessment methodology during the construction process in a real building work are shown. © 2020 The Author(s). Published by Vilnius Gediminas Technical University.es
dc.language.isoenges
dc.publisherVGTUes
dc.rightsAttribution-NonCommercial-NoDerivatives 4.0 Internacional*
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/*
dc.titleProtocol development: Level of preventive action method, considering the preventive environments in construction workses
dc.typearticlees
dc.identifier.doi10.3846/jcem.2020.13598
dc.identifier.urlhttps://doi.org/10.3846/jcem.2020.13598es
dc.issue.number8es
dc.journal.titleJournal of Civil Engineering and Managementes
dc.page.initial819es
dc.page.final835es
dc.rights.accessRightsopenAccesses
dc.subject.keywordIndustria de la construcciónes
dc.subject.keywordSeguridad y Saludes
dc.subject.keywordAnálisis de puesto de trabajoes
dc.subject.keywordErgonomíaes
dc.subject.keywordHigiene industriales
dc.subject.keywordMedidas preventivases
dc.subject.keywordAnálisis de riesgoses
dc.subject.keywordEvaluación de riesgos laboraleses
dc.subject.unesco6109.01 Prevención de Accidenteses
dc.subject.unesco5312.03 Construcciónes
dc.subject.unesco5311.04 Organización de Recursos Humanoses
dc.subject.unesco5311.07 Investigación Operativaes
dc.subject.unesco6109.03 Planificación y Evaluación Puestos de Trabajoes
dc.volume.number26es


Files in this item

FilesSizeFormatView

There are no files associated with this item.

This item appears in the following Collection(s)

Show simple item record