| dc.description.abstract | La comunicación analiza la relación directa entre el control de calidad en la ejecución de obra y la responsabilidad profesional del director de ejecución de obra. Se destaca que una supervisión insuficiente o una documentación incompleta incrementan de manera significativa la exposición del técnico a reclamaciones civiles y a procedimientos disciplinarios. El control de calidad no constituye un trámite administrativo, sino una obligación técnica que condiciona tanto la correcta ejecución de la obra como la posición profesional del responsable de la dirección de la ejecución ante la aparición de defectos materiales. La metodología de trabajo se basa en el análisis coordinado del marco normativo vigente y de situaciones reales surgidas en la práctica profesional. El estudio del marco normativo permite identificar las obligaciones del director de ejecución de obra en relación con la verificación de materiales, el control de la recepción, la supervisión de los procesos constructivos y la necesidad de garantizar la trazabilidad documental de todo el proceso. El análisis de situaciones reales, obtenidas de experiencias técnicas ampliamente compartidas en la profesión, permite valorar de qué manera la ausencia de controles suficientes o la falta de acreditación documental se convierten en elementos determinantes en la atribución de responsabilidad. Los resultados del análisis muestran que, en la práctica, los problemas más relevantes no derivan únicamente de la ejecución defectuosa de unidades concretas, sino del déficit de supervisión y de la falta de constancia documental. Cuando no existe evidencia escrita o gráfica de los controles efectuados, la interpretación técnica y jurídica suele concluir que la vigilancia exigida no se llevó a cabo con la diligencia requerida. Esta situación se reproduce especialmente en obras de pequeña entidad, donde la organización del control suele ser menos sistemática y los recursos disponibles son más limitados. La principal conclusión del trabajo es que el control de calidad constituye, de forma simultánea, un deber técnico y un mecanismo de protección profesional. El director de ejecución de obra que planifica el control, identifica los puntos críticos del proceso constructivo y documenta de manera completa las verificaciones realizadas dispone de una base sólida para acreditar su actuación. En cambio, cuando el control no se ejerce o no queda documentado, la capacidad de defensa técnica se reduce de forma notable. La comunicación pone de relieve la necesidad de estructurar un sistema de control coherente, verificable y bien documentado, especialmente en aquel tipo de obras donde esta tarea suele ser más vulnerable. El objetivo es clarificar qué se exige realmente al director de ejecución de obra y por qué la acreditación sistemática del control de calidad resulta esencial para limitar su nivel de exposición profesional y mejorar la fiabilidad del proceso constructivo. | es |
| dc.description.abstract | The communication analyses the direct relationship between quality control in the execution of works and the professional liability of the site execution manager. It highlights that insufficient supervision or incomplete documentation significantly increases the technician's exposure to civil claims and disciplinary proceedings. Quality control is not an administrative formality, but a technical obligation that conditions both the correct execution of the works and the professional position of the person responsible for site execution management when material defects appear. The working methodology is based on the coordinated analysis of the current regulatory framework and real situations arising in professional practice. The study of the regulatory framework makes it possible to identify the obligations of the site execution manager in relation to material verification, reception control, supervision of construction processes and the need to guarantee documentary traceability throughout the process. The analysis of real situations, drawn from technical experiences widely shared within the profession, makes it possible to assess how the absence of sufficient controls or the lack of documentary evidence becomes a determining factor in the attribution of liability. The results of the analysis show that, in practice, the most relevant problems do not derive solely from the defective execution of specific work units, but from a lack of supervision and a lack of documentary record. When there is no written or graphic evidence of the controls carried out, the technical and legal interpretation usually concludes that the required supervision was not performed with the necessary diligence. This situation occurs especially in small-scale works, where the organisation of control is usually less systematic and the available resources are more limited. The main conclusion of the work is that quality control constitutes, simultaneously, a technical duty and a mechanism of professional protection. The site execution manager who plans the control, identifies the critical points of the construction process and fully documents the verifications carried out has a solid basis for proving their actions. By contrast, when control is not exercised or is not documented, the capacity for technical defence is notably reduced. The communication highlights the need to structure a coherent, verifiable and well-documented control system, especially in the type of works where this task is usually more vulnerable. The objective is to clarify what is actually required of the site execution manager and why the systematic accreditation of quality control is essential to limit their level of professional exposure and improve the reliability of the construction process. | es |
| dc.description.sponsorship | Consejo General de la Arquitectura Técnica de España | es |
| dc.language.iso | spa | es |
| dc.publisher | Consejo General de la Arquitectura Técnica de España, CGATE | es |
| dc.rights | Attribution-NonCommercial-NoDerivatives 4.0 Internacional | * |
| dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/4.0/ | * |
| dc.title | Control de calidad y responsabilidad del director de ejecución de obra en la práctica profesional | es |
| dc.title.alternative | Quality control and responsibility of the project management director in professional practice | es |
| dc.type | conferenceObject | es |
| dc.identifier.conferenceObject | CONTART Alicante 2026. XI Convención Internacional de la Arquitectura Técnica | es |
| dc.rights.accessRights | openAccess | es |
| dc.subject.keyword | Control de calidad | es |
| dc.subject.keyword | Responsabilidad profesional | es |
| dc.subject.keyword | Director de Ejecución de Obras | es |
| dc.subject.keyword | Arquitecto Técnico | es |
| dc.subject.keyword | Calidad en la Edificación | es |
| dc.subject.keyword | Gestión de la calidad | es |
| dc.subject.keyword | Práctica profesional | es |
| dc.subject.keyword | Deontología | es |
| dc.subject.keyword | Edificación | es |
| dc.subject.keyword | Gestión | es |
| dc.subject.unesco | 3305 Tecnología de la Construcción | es |
| dc.subject.unesco | 3305.23 Organización de Obras | es |
| dc.subject.unesco | 5605.02 Derecho Civil | es |
| dc.subject.unesco | 5311 Organización y Dirección de Empresas | es |