Mostrar el registro sencillo del ítem

dc.contributor.authorCostales Calvo, Ignacio
dc.contributor.authorFont Basté, Jaume
dc.contributor.authorGimferrer i Vilaplana, Xavier
dc.contributor.authorLlorens Solivera, Miquel
dc.date.accessioned2026-07-01T07:48:30Z
dc.date.available2026-07-01T07:48:30Z
dc.date.issued2024
dc.identifier.citationCostales Calvo, I., Font Basté, J., Gimferrer i Vilaplana, X., y Llorens Solivera, M. (2024). Unshoring Process of a Temporary Pillar, in a Seventeen-Storey Building in Sant Adrià del Besós. Buildings, 14(11). https://doi.org/10.3390/buildings14113436es
dc.identifier.issn2075-5309
dc.identifier.urihttp://hdl.handle.net/20.500.12251/4458
dc.description.abstractIn the new construction of a seventeen-storey building, a provisional prop of fourteen-meter height, horizontally braced on two intermediate levels, has been used. Despite the fact that structural logic suggests that it can be cut without having any added safety precautions, the structure of the building, made up of cores and reinforced concrete slabs working spatially, indicates that certain mechanisms be introduced so that, in the event that different and worse behaviors than expected are detected, the process can be stopped and the consequences of the new situation observed can be analyzed. For this purpose, two pairs of four metallic cantilevers were introduced at mid-height with four hydRaúlic pistons. In addition, the best position of a series of strain gauges as well as transducers were analyzed. At first, a load test was carried out to check that the brackets worked correctly. Once this step was verified, the abutment was cut, and the results were read. The results of stresses and deformations were compared with those expected, always being satisfactory. Finally, four provisional profiles were placed in case after a few days the structure suddenly gave way. The research focuses on obtaining an efficient control system and achieving total security throughout the process, with the comparison of the results strictly necessary for this case. Few resources were used so as not to make the work excessively expensive. We have found important divergences, on the side of security, between calculation and reality. We have also considered that the construction process has an impact on the final results. In the same way, the rigidity of the temporal abutment must be considered before the calculation. All these factors have generated a lower-than-expected deformation in an 8 m cantilever. © 2024 by the authors.es
dc.language.isoenges
dc.rightsAttribution-NonCommercial-NoDerivatives 4.0 Internacional*
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/*
dc.titleUnshoring Process of a Temporary Pillar, in a Seventeen-Storey Building in Sant Adrià del Besóses
dc.typearticle
dc.identifier.doi10.3390/buildings14113436
dc.identifier.urlhttps://www.scopus.com/pages/publications/85210549644?origin=AuthorProfile
dc.issue.number11es
dc.journal.titleBuildingses
dc.rights.accessRightsopenAccesses
dc.subject.keywordHormigónes
dc.subject.keywordEstructuras de hormigón armadoes
dc.subject.keywordYesoes
dc.subject.keywordCementoes
dc.subject.keywordHormigón Autocompactante (HAC)es
dc.subject.keywordPuenteses
dc.subject.unesco3305 Tecnología de la Construcciónes
dc.subject.unesco3305.05 Tecnología del Hormigónes
dc.subject.unesco3305.32 Ingeniería de Estructurases
dc.subject.unesco3312 Tecnología de Materialeses
dc.subject.unesco3305.33 Resistencia de Estructurases
dc.subject.unesco3305.15 Ingeniería Hidráulicaes
dc.subject.unesco3308 Ingeniería y Tecnología del Medio Ambientees
dc.volume.number14


Ficheros en el ítem

FicherosTamañoFormatoVer

No hay ficheros asociados a este ítem.

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem