Show simple item record

dc.contributor.authorVilloria Sáez, Paola
dc.contributor.authorRío Merino, Mercedes del
dc.contributor.authorPorras Amores, César
dc.contributor.authorSanta Cruz Astorqui, Jaime
dc.contributor.authorGonzález Pericot, Natalia
dc.date.accessioned2026-07-01T07:49:03Z
dc.date.available2026-07-01T07:49:03Z
dc.date.issued2019
dc.identifier.citationVilloria Sáez, P., Río Merino, M. D., Porras Amores, C., Santa Cruz Astorqui, J., y González Pericot, N. (2019). Analysis of Best Practices to Prevent and Manage the Waste Generated in Building Rehabilitation Works. Sustainability, 11(10), 2796. https://doi.org/10.3390/su11102796es
dc.identifier.issn2071-1050
dc.identifier.urihttp://hdl.handle.net/20.500.12251/4688
dc.description.abstractThis paper carries out a survey conducted among the construction agents in order to evaluate the effectiveness and viability of several best practice measures regarding construction and demolition waste (CDW) management in building rehabilitation works. This survey was developed considering that in rehabilitation works two well differentiated activities are carried out: those of the dismantling of the building (deconstruction activities) and those of the execution of the new construction (construction activities). Results of this survey show that among the highly rated best practices for the design phase designing the building in order to help the recovery of the materials at the end of its use can be highlighted, despite less than 25% of respondents usually implement this measure in their works. Moreover, according to BP during the construction phase, the results reveal that only 70% of respondents routinely implement the most valued measure Hiring authorized companies for the management of CDW and 60% the second Respecting the manufacturer's directions regarding the transport, collection and commissioning.es
dc.language.isoenges
dc.rightsAttribution-NonCommercial-NoDerivatives 4.0 Internacional*
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/*
dc.titleAnalysis of Best Practices to Prevent and Manage the Waste Generated in Building Rehabilitation Workses
dc.typearticle
dc.identifier.doi10.3390/su11102796
dc.issue.number10es
dc.journal.titleSustainabilityes
dc.page.initial2796es
dc.rights.accessRightsopenAccesses
dc.subject.keywordResiduos de Construcción Demolición (RCD)es
dc.subject.keywordBuenas prácticases
dc.subject.keywordGestión de residuoses
dc.subject.keywordObras de rehabilitaciónes
dc.subject.keywordRehabilitación de edificioses
dc.subject.keywordReducir, Reutilizar, Reciclar (3R)es
dc.subject.unesco3305 Tecnología de la Construcciónes
dc.subject.unesco3312 Tecnología de Materialeses
dc.subject.unesco3308.07 Eliminación de Residuoses
dc.subject.unesco5312.03 Construcciónes
dc.volume.number11


Files in this item

FilesSizeFormatView

There are no files associated with this item.

This item appears in the following Collection(s)

Show simple item record

Attribution-NonCommercial-NoDerivatives 4.0 Internacional
Except where otherwise noted, this item's license is described as Attribution-NonCommercial-NoDerivatives 4.0 Internacional