The Fuzzy Project Scheduling Problem with Minimal Generalized Precedence Relations
| dc.contributor.author | Ponz Tienda, José Luis | |
| dc.contributor.author | Pellicer Armiñana, Eugenio | |
| dc.contributor.author | Benlloch Marco, Javier | |
| dc.contributor.author | Andrés Romano, C. | |
| dc.date.accessioned | 2026-07-01T07:51:21Z | |
| dc.date.available | 2026-07-01T07:51:21Z | |
| dc.date.issued | 2015 | |
| dc.identifier.citation | Ponz Tienda, J. L., Pellicer Armiñana, E., Benlloch Marco, J., y Andrés Romano, C. (2015). The Fuzzy Project Scheduling Problem with Minimal Generalized Precedence Relations. Computer-Aided Civil and Infrastructure Engineering, 30(11), 872-891. https://doi.org/10.1111/mice.12166 | es |
| dc.identifier.issn | 1093-9687 | |
| dc.identifier.uri | http://hdl.handle.net/20.500.12251/5231 | |
| dc.description.abstract | In scheduling, estimations are affected by the imprecision of limited information on future events, and the reduction in the number and level of detail of activities. Overlapping of processes and activities requires the study of their continuity, along with analysis of the risks associated with imprecision. In this line, this article proposes a fuzzy heuristic model for the Project Scheduling Problem with flows and minimal feeding, time and work Generalized Precedence Relations with a realistic approach to overlapping, in which the continuity of processes and activities is allowed in a discretionary way. This fuzzy algorithm handles the balance of process flows, and computes the optimal fragmentation of tasks, avoiding the interruption of the critical path and reverse criticality. The goodness of this approach is tested on several problems found in the literature; furthermore, an example of a 15-story building was used to compare the better performance of the algorithm implemented in Visual Basic for Applications (Excel) over that same example input in Primavera © P6 Professional V8.2.0, using five different scenarios. ©2015 Computer-Aided Civil and Infrastructure Engineering. | es |
| dc.language.iso | eng | es |
| dc.publisher | Blackwell Publishing Inc | es |
| dc.rights | Attribution-NonCommercial-NoDerivatives 4.0 Internacional | * |
| dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/4.0/ | * |
| dc.title | The Fuzzy Project Scheduling Problem with Minimal Generalized Precedence Relations | es |
| dc.type | article | |
| dc.identifier.doi | 10.1111/mice.12166 | |
| dc.identifier.url | https://www.scopus.com/inward/record.uri?eid=2-s2.0-84942787156&doi=10.1111%2fmice.12166&partnerID=40&md5=d23a905df10cdf69345b0a4a9512c793 | |
| dc.issue.number | 11 | es |
| dc.journal.title | Computer-Aided Civil and Infrastructure Engineering | es |
| dc.page.initial | 872 | es |
| dc.page.final | 891 | es |
| dc.rights.accessRights | openAccess | es |
| dc.subject.keyword | Gestión de proyectos | es |
| dc.subject.keyword | Algoritmos | es |
| dc.subject.keyword | Project Management | es |
| dc.subject.unesco | 1203.09 Diseño Con Ayuda del Ordenador | es |
| dc.subject.unesco | 3305 Tecnología de la Construcción | es |
| dc.subject.unesco | 3305.23 Organización de Obras | es |
| dc.subject.unesco | 1207 Investigación Operativa | es |
| dc.volume.number | 30 |