Show simple item record

dc.contributor.authorMéndez, Daniela
dc.contributor.authorLorca, Fabiana
dc.contributor.authorCarpio Martínez, Manuel
dc.date.accessioned2026-07-01T08:01:44Z
dc.date.available2026-07-01T08:01:44Z
dc.date.issued2025
dc.identifier.citationMéndez, D., Lorca, F., y Carpio Martínez, M. (2025). Using the dfma approach in the early integration of actors for the design of an industrialized timber building - case study. En Proc. from World Conf. Timber Eng.: Adv. Timber Future Built Environ., WCTE (pp. 882-890). World Conference on Timber Engineering (WCTE). https://doi.org/10.52202/080513-0110es
dc.identifier.urihttp://hdl.handle.net/20.500.12251/5860
dc.description.abstractDesign for Manufacture and Assembly (DfMA) isamethodology that optimizes the design process to facilitate manufacturing and assembly, promoting more efficient and cost-effective construction. This study describes the process of early integration of actors inacase study of an industrialized timber building in Chile, framed in the Housing Emergency Plan. Involving architects, engineers, manufacturers, and builders from the early stages, the DfMA methodology was applied to improve communication and coordination between all actors. Five design stages were identified based on the RIBA guide, and BIM and modeling tools were used to integrate information from all participants. The results indicate that, although design time increases, production is more efficient, with fewer errors and rework, and higher construction quality. This study providesaframework for future projects in the construction industry, highlighting the importance of early integration and use of digital tools. Future work should validate time and cost savings, reduction in waste, improvement in quality and processes in manufacturing and construction phases. © (2025) WORLD CONFERENCE ON TIMBER ENGINEERING 2025 (WCTE 2025) All rights reserved.es
dc.language.isoenges
dc.publisherWorld Conference on Timber Engineering (WCTE)es
dc.rightsAttribution-NonCommercial-NoDerivatives 4.0 Internacional*
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/*
dc.titleUsing the dfma approach in the early integration of actors for the design of an industrialized timber building - case studyes
dc.typeconferenceObject
dc.identifier.conferenceObjectProc. from World Conf. Timber Eng.: Adv. Timber Future Built Environ., WCTEes
dc.identifier.doi10.52202/080513-0110
dc.identifier.urlhttps://www.scopus.com/results/results.uri?sort=plf-f&src=s&sid=531065c6b9e037c6b4311aa7ce1abb01&sot=a&sdt=a&sl=18&s=AU-ID%2835174256100%29&origin=searchadvanced&editSaveSearch=&txGid=194206dc28ad569dc3334557f2346467&sessionSearchId=531065c6b9e037c6b4311aa7ce1abb01&limit=100
dc.page.initial882es
dc.page.final890es
dc.rights.accessRightsopenAccesses
dc.subject.keywordBuilding Information Modeling (BIM)es
dc.subject.keywordMaderaes
dc.subject.keywordConstrucción industrializadaes
dc.subject.keywordConstrucción prefabricadaes
dc.subject.keywordEstructura de maderaes
dc.subject.keywordMadera estructurales
dc.subject.keywordDiseño arquitectónicoes
dc.subject.unesco1203.09 Diseño Con Ayuda del Ordenadores
dc.subject.unesco1203.17 Informáticaes
dc.subject.unesco3305 Tecnología de la Construcciónes
dc.subject.unesco3305.24 Construcciones Prefabricadases
dc.subject.unesco3305.39 Construcciones de Maderaes


Files in this item

FilesSizeFormatView

There are no files associated with this item.

This item appears in the following Collection(s)

Show simple item record