dc.identifier.citationGómez Cabrera, A., Salazar, L. A., Ponz Tienda, J. L., y Alarcón, L. F. (2020). Lean tools proposal to mitigate delays and cost overruns in construction projects. En IGLC 28 - 28th Annual Conference of the International Group for Lean Construction 2020; 28th Annual Conference of the International Group for Lean Construction 2020, IGLC 2020 (pp. 769-781). The International Group for Lean Construction. https://doi.org/10.24928/2020/0049es
dc.identifier.urihttp://hdl.handle.net/20.500.12251/5947
dc.description.abstractConstruction projects are carried out under the triple constraint of cost, time, and scope, as stated in the project management literature. However, time and cost deviations in the construction industry are frequent, and their magnitude in many cases is considerable, generating harmful consequences. This paper developed a literature review to examine 33 research papers published since 1988 in the Web of Science database to identify the main factors causing these deviations, demonstrating that there is no evidence that it is a problem exclusive from a region, country, or project type. A list of 74 factors has been identified from the top ten reported in each paper. The factors were grouped, taking into account their origin. Simultaneously through literature review, tools, methods, and approaches of Lean Construction were also identified, and after an analysis of its nature, these tools were assigned to the previously identified factors considering the possibilities to mitigate their effects. For more than 88% of the identified factors, a Lean tool, method, or approach was identified, demonstrating that both topics are related, and the body of literature developed must be integrated. © 2020 IGLC 28 - 28th Annual Conference of the International Group for Lean Construction 2020. All rights reserved.es
dc.language.isoenges
dc.publisherThe International Group for Lean Constructiones
dc.rightsAttribution-NonCommercial-NoDerivatives 4.0 Internacional*
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/*
dc.titleLean tools proposal to mitigate delays and cost overruns in construction projectses
dc.typeconferenceObject
dc.identifier.doi10.24928/2020/0049
dc.identifier.urlhttps://www.scopus.com/inward/record.uri?eid=2-s2.0-85104833857&doi=10.24928%2f2020%2f0049&partnerID=40&md5=2e161ac813e66bfbca3c849b8c22229c
dc.journal.titleIGLC 28 - 28th Annual Conference of the International Group for Lean Construction 2020; 28th Annual Conference of the International Group for Lean Construction 2020, IGLC 2020es
dc.page.initial769es
dc.page.final781es
dc.rights.accessRightsopenAccesses
dc.subject.keywordLean Construction (LC)es
dc.subject.keywordGestión de proyectoses
dc.subject.keywordProject Managementes
dc.subject.keywordCostes de construcciónes
dc.subject.keywordPlazo de ejecuciónes
dc.subject.keywordPlanificación de obrases
dc.subject.unesco3305 Tecnología de la Construcciónes
dc.subject.unesco3305.23 Organización de Obrases
dc.subject.unesco5312.03 Construcciónes


Files in this item

FilesSizeFormatView

There are no files associated with this item.

This item appears in the following Collection(s)

Show simple item record