Mostrar el registro sencillo del ítem

dc.contributor.authorPérez Díaz, Pedro Antonio
dc.contributor.authorMartín Dorta, Norena Natalia
dc.contributor.authorGutiérrez García, Francisco Javier
dc.date.accessioned2023-07-11T06:23:15Z
dc.date.available2023-07-11T06:23:15Z
dc.date.issued2022
dc.identifier.citationPérez Díaz, P. A., Martín Dorta, N. N. y Gutiérrez García, F. J. (2022). Construction Labour Measurement in Reinforced Concrete Floating Caissons in Maritime Ports. Civil Engineering Journal (Iran), 8(2), 195-208. https://doi.org/10.28991/CEJ-2022-08-02-01es
dc.identifier.issn2676-6957
dc.identifier.urihttp://hdl.handle.net/20.500.12251/3068
dc.description.abstractThis research work attempts to approach the measuring of the working equipment necessary to make floating caissons for maritime work and their performances. With this objective, an empirical study has been carried out based on the construction of five floating caissons with a rectangular layout of 34.00 meters in length, 17.00 meters in width, and 19.00 meters in depth, lightened with 32 vertical cells. This work was carried out in the port of Granadilla, Tenerife (Spain). The updated scientific literature related to the execution of this type of floating structure refers to the importance of the calculation hypotheses, the actions to be taken into account, the service states or the importance of the choice of materials (concrete and steel). However, scientific research does not seem to face the problem of how to size the working team necessary to execute this type of structure. The work force is approached from the point of view of the adequate sizing of working groups. The important contribution of the article to the project and construction management literature is the development and capability of an easy-to-use optimization model for planning the labour and labour days required in floating caisson construction. The optimization model proposed in this research allows the project managers of a construction company to estimate the labour costs and teams necessary in the execution of the construction. This gives it a competitive advantage both in the construction phase and in the bidding phase for the award of the work. © 2022 by the authors. Licensee C.E.J, Tehran, Iran.en
dc.language.isoenges
dc.publisherC EJ PUBLISHING GROUPes
dc.titleConstruction Labour Measurement in Reinforced Concrete Floating Caissons in Maritime Portsen
dc.typearticlees
dc.identifier.doi10.28991/CEJ-2022-08-02-01
dc.identifier.urlhttps://www.scopus.com/inward/record.uri?eid=2-s2.0-85127777039&doi=10.28991%2fCEJ-2022-08-02-01&partnerID=40&md5=fcb17fe0934a717a13cb2f4229e979fa
dc.issue.number2
dc.journal.titleCivil Engineering Journal (Iran)
dc.page.initial195es
dc.page.final208es
dc.subject.keywordEstructura flotantees
dc.subject.keywordGestión de proyectoses
dc.subject.keywordGestión de la producciónes
dc.subject.keywordEstructuras - Construcciónes
dc.subject.unesco3305.15 Ingeniería Hidráulicaes
dc.subject.unesco3305.11 Puertoses
dc.subject.unesco3305.32 Ingeniería de Estructurases
dc.subject.unesco5311.04 Organización de Recursos Humanoses
dc.subject.unesco5311.02 Gestión Financieraes
dc.volume.number8