Critical analysis of risk assessment methods applied to construction works
Identificadores
Compartir
Estadísticas
Ver Estadísticas de usoMetadatos
Mostrar el registro completo del ítemAutor
Fecha
2017Materia/s
Seguridad y Salud en el Trabajo (SST)
Prevención de riesgos laborales
Materia/s Unesco
Resumen
This paper studies the possibility of using the following occupational risk assessment methods for construction works: INSHT, ANACT, THREP, SHERPA, RNUR, EVENT TREE, LEST, FINE, ERGONOMIC ANALYSIS and PSYCHOSOCIAL FACTORS. Of these methods, INSHT, ANACT, RNUR and FINE have been selected with the objective of applying them to real building works, in order to determine the discrepancies in the results obtained compared to the risks analyzed. The results make it possible to ascertain the types of risk which each method most reliably detects, there being methods which are not able to detect extreme or very low risks. It is concluded that if a single risk assessment method is used, the results do not entirely reflect reality, as such it is necessary to establish a new risk assessment methodology for construction works.
This paper studies the possibility of using the following occupational risk assessment methods for construction works: INSHT, ANACT, THREP, SHERPA, RNUR, EVENT TREE, LEST, FINE, ERGONOMIC ANALYSIS and PSYCHOSOCIAL FACTORS. Of these methods, INSHT, ANACT, RNUR and FINE have been selected with the objective of applying them to real building works, in order to determine the discrepancies in the results obtained compared to the risks analyzed. The results make it possible to ascertain the types of risk which each method most reliably detects, there being methods which are not able to detect extreme or very low risks. It is concluded that if a single risk assessment method is used, the results do not entirely reflect reality, as such it is necessary to establish a new risk assessment methodology for construction works.