Methodology for quantification of waste generated in Spanish railway construction works
Identificadores
Compartir
Estadísticas
Ver Estadísticas de usoMetadatos
Mostrar el registro completo del ítemAutor
Fecha
2012Materia/s Unesco
3305 Tecnología de la Construcción
3305.39 Construcciones de Madera
1203 Ciencia de Los Ordenadores
1203.04 Inteligencia Artificial
1203.09 Diseño Con Ayuda del Ordenador
1209.09 Análisis Multivariante
3312.08 Propiedades de Los Materiales
3312.09 Resistencia de Materiales
3312.13 Tecnología de la Madera
3308.07 Eliminación de Residuos
5506.01 Historia de la Arquitectura
Resumen
In the last years, the European Union (EU) has been focused on the reduction of construction and demolition (C&D) waste. Specifically, in 2006, Spain generated roughly 47. million tons of C&D waste, of which only 13.6% was recycled. This situation has lead to the drawing up of many regulations on C&D waste during the past years forcing EU countries to include new measures for waste prevention and recycling. Among these measures, the mandatory obligation to quantify the C&D waste expected to be originated during a construction project is mandated. However, limited data is available on civil engineering projects.Therefore, the aim of this research study is to improve C&D waste management in railway projects, by developing a model for C&D waste quantification. For this purpose, we develop two equations which estimate in advance the amount, both in weight and volume, of the C&D waste likely to be generated in railway construction projects, including the category of C&D waste generated for the entire project. © 2012 Elsevier Ltd.
In the last years, the European Union (EU) has been focused on the reduction of construction and demolition (C&D) waste. Specifically, in 2006, Spain generated roughly 47. million tons of C&D waste, of which only 13.6% was recycled. This situation has lead to the drawing up of many regulations on C&D waste during the past years forcing EU countries to include new measures for waste prevention and recycling. Among these measures, the mandatory obligation to quantify the C&D waste expected to be originated during a construction project is mandated. However, limited data is available on civil engineering projects.Therefore, the aim of this research study is to improve C&D waste management in railway projects, by developing a model for C&D waste quantification. For this purpose, we develop two equations which estimate in advance the amount, both in weight and volume, of the C&D waste likely to be generated in railway construction projects, including the category of C&D waste generated for the entire project. © 2012 Elsevier Ltd.