Complete fuzzy scheduling and fuzzy earned value management in construction projects
Identificadores
Compartir
Estadísticas
Ver Estadísticas de usoMetadatos
Mostrar el registro completo del ítemAutor
Fecha
2012Materia/s Unesco
3305 Tecnología de la Construcción
5802 Organización y Planificación de la Educación
5801 Teoría y Métodos Educativos
1203 Ciencia de Los Ordenadores
1203.04 Inteligencia Artificial
Resumen
This paper aims to present a comprehensive proposal for project scheduling and control by applying fuzzy earned value. It goes a step further than the existing literature: in the formulation of the fuzzy earned value we consider not only its duration, but also cost and production, and alternatives in the scheduling between the earliest and latest times. The mathematical model is implemented in a prototypical construction project with all the estimated values taken as fuzzy numbers. Our findings suggest that different possible schedules and the fuzzy arithmetic provide more objective results in uncertain environments than the traditional methodology. The proposed model allows for controlling the vagueness of the environment through the adjustment of the a-cut, adapting it to the specific circumstances of the project. © Zhejiang University and Springer-Verlag Berlin Heidelberg 2012.
This paper aims to present a comprehensive proposal for project scheduling and control by applying fuzzy earned value. It goes a step further than the existing literature: in the formulation of the fuzzy earned value we consider not only its duration, but also cost and production, and alternatives in the scheduling between the earliest and latest times. The mathematical model is implemented in a prototypical construction project with all the estimated values taken as fuzzy numbers. Our findings suggest that different possible schedules and the fuzzy arithmetic provide more objective results in uncertain environments than the traditional methodology. The proposed model allows for controlling the vagueness of the environment through the adjustment of the a-cut, adapting it to the specific circumstances of the project. © Zhejiang University and Springer-Verlag Berlin Heidelberg 2012.