Obtaining building plaster used in building for forming ceiling, involves mixing recycled slag, additives and water in a blast furnace to obtain a homogeneous material
Metadata
Show full item recordAuthor
Date
2013Unesco Subject/s
3305 Tecnología de la Construcción
3308.07 Eliminación de Residuos
3307.17 Dispositivos Termoeléctricos
3305.33 Resistencia de Estructuras
Abstract
Obtaining building plaster used in building for forming ceiling, involves mixing recycled slag, additives and water in a blast furnace to obtain a homogeneous material. Water is added to the material and then the material is kneaded. 0-60% of gypsum slag and 0.35-0.40% added to the kneaded material. The materials are heated and processed at compression strength of 2.18 MPa, 3.94 MPa for 7 days and 0.81-7.16 MPa for 28 days. USE - Method for obtaining building plaster used in building for forming ceiling. ADVANTAGE - The method enables to obtain building plaster efficiently.
Obtaining building plaster used in building for forming ceiling, involves mixing recycled slag, additives and water in a blast furnace to obtain a homogeneous material. Water is added to the material and then the material is kneaded. 0-60% of gypsum slag and 0.35-0.40% added to the kneaded material. The materials are heated and processed at compression strength of 2.18 MPa, 3.94 MPa for 7 days and 0.81-7.16 MPa for 28 days. USE - Method for obtaining building plaster used in building for forming ceiling. ADVANTAGE - The method enables to obtain building plaster efficiently.